ITAC

Mansoor Ahmed
2 min readJan 4, 2024

IT Application Controls Testing is a process that ensures that the application controls are working as intended. It is essential for ensuring that the data processed by the application is accurate and complete. IT Application Controls Testing can be divided into several phases.

Phases of IT Application Controls Testing

The following are the phases of IT Application Controls Testing:

  1. Planning Phase: In this phase, the auditor identifies the scope, objectives and resources required for the testing. The auditor also identifies the controls to be tested and the testing procedures to be used.
  2. Testing Phase: In this phase, the auditor performs the testing procedures identified in the planning phase. The auditor also documents the results of the testing and identifies any issues or exceptions.
  3. Reporting Phase: In this phase, the auditor prepares a report that summarizes the testing results. The report should include the scope of the testing, the objectives of the testing, the testing procedures used, the results of the testing, and any issues or exceptions identified.
  4. Follow-up Phase: In this phase, the auditor follows up on any issues or exceptions identified in the testing phase. The auditor verifies that the issues or exceptions have been addressed and that the controls are working as intended.

Procedure for IT Application Controls Testing

The following is the procedure for IT Application Controls Testing:

  1. Identify the Controls to be Tested: The auditor identifies the controls to be tested based on the scope of the testing and the objectives of the testing.
  2. Identify the Testing Procedures to be Used: The auditor identifies the testing procedures to be used based on the controls to be tested.
  3. Perform the Testing Procedures: The auditor performs the testing procedures identified in step 2.
  4. Document the Results of the Testing: The auditor documents the results of the testing, including any issues or exceptions identified.
  5. Prepare a Report: The auditor prepares a report that summarizes the testing results.
  6. Follow-up on Issues or Exceptions: The auditor follows up on any issues or exceptions identified in the testing phase.

Conclusion

In conclusion, IT Application Controls Testing is essential for ensuring that the data processed by the application is accurate and complete. IT Application Controls Testing can be divided into several phases, including the planning phase, testing phase, reporting phase, and follow-up phase. The procedure for IT Application Controls Testing includes identifying the controls to be tested, identifying the testing procedures to be used, performing the testing procedures, documenting the results of the testing, preparing a report, and following up on any issues or exceptions identified. By implementing IT Application Controls Testing, companies can ensure that their IT environment is secure and reliable.

Be sure to get test environment before involving in ITAC testing's

--

--